A pipe bridge.
A simple pipe bridge made from one beam sliced twice along the span. The interesting fact is that in the splices preloaded TCB bolts (tension control bolts) were used and the installation method: the beams were levelled and then the bolts inserted in splices and tensioned with Engineer witnessing the process, after successful installation of the bolts the whole beam along with pipe installed was lifted and placed on supports.